Observed condition values are those determined from inspections and construction dates. The Date column must contain the dates of all inspections and Major M&R dates of all the sections being analyzed. The first date cannot be before the first construction date of the oldest section being analyzed. Assume the following data are in the database:

Date

Section 1 PCI

Section 1 PCI Type

Section 2 PCI

 

Section 2 PCI Type

Average

1/1/1995

100

Initial Construction

 

 

 

6/1/1998

91

Inspection

 

 

 

9/1/2000

 

 

100

Initial Construction

 

6/1/2001

82

Inspection

97

Inspection

 

9/1/2004

100