Condition Estimation using Interpolation

The interpolation equation is:

Where:

p.x is property x of the condition/date pair being estimated

l.x is property x of the last observed condition before the condition/date pair being estimated

n.x is property x of the next observed condition after the condition/date pair being estimated

Age properties are always determined based on time elapsed since the last Major M&R construction event.

Date

Section 1 PCI

Section 1 PCI Type

Section 2 PCI

 

Section 2 PCI Type

Average

1/1/1995

100

Initial Construction

NULL

NULL

 

1/1/1996

97.4

Interpolation

NULL

NULL

 

1/1/1997

94.9

Interpolation

NULL

NULL

 

1/1/1998

92.3

Interpolation

NULL

NULL

 

6/1/1998

91

Inspection

NULL

NULL

 

6/1/1999

88.4

Interpolation

NULL

NULL

 

6/1/2000

85.9

Interpolation

NULL

NULL

 

9/1/2000

83.3

Interpolation

100

Initial Construction

 

6/1/2001

82

Inspection

97

Inspection

 

6/1/2002

 

Family

 

Family

 

6/1/2003

 

Family

 

Family

 

6/1/2004

 

Family

 

Family

 

9/1/2004

 

Family

 

Family

 

9/1/2004

100

Reconstruction

 

Family

 

1/1/2005

 

Family

 

Family