Insert the End Date of the Condition Analysis

A condition analysis will have an associated end date. Insert it at the appropriate place in the table. If the provided end date is 1/1/2005, it would be inserted as shown below.

Date

Section 1 PCI

Section 1 PCI Type

Section 2 PCI

 

Section 2 PCI Type

Average

1/1/1995

100

Initial Construction

 

 

 

6/1/1998

91

Inspection

 

 

 

9/1/2000

 

 

100

Initial Construction

 

6/1/2001

82

Inspection

97

Inspection

 

9/1/2004

100

Reconstruction

 

 

 

1/1/2005