|
L - The difference between the pavement edge and shoulder is >25 and ≤50 mm (>1 and ≤2 in.). |
|
M - The difference in elevation is >50 and ≤100mm (>2 and ≤4 in.). |
|
H - The difference in elevation is >100 mm (>4 in.). |